Dhaulagiri Kalika Hydro Limited Home / Directory
Dhaulagiri Kalika Hydro Limited
Gyanewshwor-30, Kathmandu MC, Kathmandu, Bagmati
Utilities and Infrastructure
Address Gyanewshwor-30, Kathmandu MC, Kathmandu, Bagmati

Nepal has a very high potential for developing hydropower, which is a perfect source of clean energy. Theoretically, this mountainous country has the potential to produce 83,000.00MW, however projects that are technically and financially viable is estimated to be around 45,000.00MW.

In recent years, the Government of Nepal has formulated policies to encourage private sectors to develop hydropower projects. Hence Dhaulagiri Kalika Hydro Limited (DKHL) was established with the aim of developing hydropower projects in Nepal.

Darbang Myagdi Hydro-Electric Project (DMHEP) is one of the projects being developed by Dhaulagiri Kalika Hydro Ltd. This is a 25MW, Run-of-River type hydropower project located in Darbang, Malika Gaon Palika, Myagdi District, Gandagi Province of Nepal.

The project utilizes the water from Myagdi River which is a snow-fed perennial river having its sources at Dhaulagiri, Churen and Gurja Himal. The catchment area is 893km2 and the design discharge of 31.4m3/s through the gross head of 104m. The installed capacity of the project is 25 MW and the estimated annual energy generation is 150.08 GWh.

 


 

Mission
Encourage investment in clean and sustainable energy projects while maintaining shareholders’ return and fulfilling socio-economic obligations.

 


 

Vision
Participate in Nation’s development by developing Clean and Sustainable Energy.

Claim this Directory

Please log in to claim this directory.

Ratings & Reviews

0.0 (No reviews yet)
Please log in to leave a review.

No reviews yet. Be the first to rate this directory.

Discussion & Queries

Ask a question or share an update (e.g. number unavailable, changed address).

Please log in to join the discussion.

No comments yet. Be the first to start the discussion.