Provincial Government of Bagamati
Ministry of Water Supply, Energy & Irrigation
Groundwater Resources & Irrigation Development Division
Parsakhirahani, Chitwan
| NCB05/082/83(DTW-JALDEVI) | Construction of 200 mm dia*100 m Depth deep Tubewell by Percussion method, Kalika-3, Chitwan | Anami Drilling Pvt. Ltd., Kirtipur-10, Kathmandu | Rs. 7,75,424.00 without VAT & PS |
| NCB06/082/83(DTW-PAURABI) | Construction of 200 mm dia* 100 m Depth deep Tubewell by Rotary method, Madi-7, Chitwan | Anami Drilling Pvt. Ltd., Kirtipur-10, Kathmandu | Rs. 8,96,532.00 without VAT & PS |
| NCB07/082/83(DTW-KALIKA) | Construction of 200 mm dia*100 m Depth deep Tubewell by Percussion method, Kalika-2, Chitwan | Anami Drilling Pvt. Ltd., Kirtipur-10, Kathmandu | Rs. 7,77,920.00 without VAT & PS |
| NCB08/082/83(DTW-PATIHANI) | Construction of 200 mm dia 100 m Depth deep Tubewell by Percussion method, Bharatpur-22, Chitwan | Anami Drilling Pvt. Ltd., Kirtipur-10, Kathmandu | Rs. 8,94,400.00 without VAT & PS |
| NCB09/082/83(DTW-SITAL) | Construction of 200 mm dia*100 m Depth deep Tubewell by Rotary method, Madi-4, Chitwan | Anami Drilling Pvt. Ltd., Kirtipur-10, Kathmandu | Rs. 6,99,400.00 without VAT & PS |
| NCB10/082/83(PPE-JAG) | Construction of Pump House, Installation of Pump & Electrification works of Madi Na. Pa.-07, Chitwan (Jaganathpuri DTW ISP) | Siraichuli Nirman Sewa Pvt. Ltd., Kageswari-9, Kathmandu | Rs. 15,75,489.30 without VAT & PS |
| NCB11/082/83(PPE-TUL) | Construction of Pump House with HDPE Pipeline Distribution, Installation of. Pump & Electrification works of Kalika Na. Pa. 06, Chitwan (Namuna Tol Tulimaya DTW ISP) | Siraichuli Nirman Sewa Pvt. Ltd., Kageswari-9, Kathmandu | Rs. 15,76,180.90 without VAT & PS |
© 2026 Suchanaa. All Rights Reserved.