Nepal Electricity Authority
| GOD/2082/083-06 | Installation, Testing and Commissioning of 132/66 kV Power Transformer and its associated works at Lamosanghu and Sunkoshi Substations | M/s MSIPL-MBPL JV, Chhauni, Kathmandu, Nepal | NRs. 92,514,073.46 (Excluding VAT and PS) |
| NEA-KNTLP-2082/83-SQ-01 | Construction of RCC Culvert at Pedari Nala, Baijanath RM-07, Banke | M/s Durga Nirman Sewa, Jufal-03, Dolpa | NRs. 11,26,335.18 (With VAT) |
| PMD/LCSCP/NCB/Works/2082/83-01 | Construction of RCC Approach Road and Village Roads Around Lapsiphedi Substation | M/s Sunstar-Subha bihani J.V, Dolakha, Nepal | NRs. 3,56,76,971.11 (With VAT) |
| NEA-INWDC-2082/083-03(SQ)RE | HT/LT line Maintenance work at Different places of inaruwa DCS | M/s Laxman Construction Bramhapur-5, Saptari | NRs. 4,06,223.70 (With VAT) |
| NEA-INWDC-2082/083-04(SQ)RE | HT/LT line Electrification Work at Different Places of Inaruwa DCS | M/s Laxman Construction Bramhapur-5, Saptari | NRs. 4,88,517.19 (With VAT) |
| NEA-INWDC-2082/083-05(SQ)RE | Supply and delivery of tools and line materials. | M/s Creative Nepal Engineering & Construction Pvt. Ltd. Kathmandu-29 | NRs. 9,28,521.00 (With VAT) |
| NEA/GDC/2082/083/01NCB | Construction of Godown Block at Gauradaha DC | M/s Sagarmatha Bhagwati Construction, Kamal 1, Jhapa | NRs.31,90,712.49 (With VAT) |