Nepal Electricity Authority
| GOD/2082/083-04 | Protection of Tower no. 15 of Trisuli 3A-Matatirtha TL and Tower no. 12 of Samundratar-Trisuli 3B Hub TL at Nuwakot | M/s Sagarmatha/Ashika JV, Hetauda, Makawanpur | NRs. 2,69,78,713.71 With VAT |
| NEA-KL1-2082/083-MST-06 | Repair and Maintenance of Pelton Runner, Thrust Bearing Pads and Guide Bearing Pads of KL1HPS | M/s Nepal Hydro & Electric Limited, Butwal, Rupandehi. | NRs. 36,36,882.40 With VAT |
| NEA-KL1-2082/083-EMST-09 | Supply and Delivery of Electro- Mechanical Consumable Items at KL1HPS | M/s Himalaya Electricals Pvt.Ltd, Biratnagar, Morang | NRs. 41,87,893.00 With VAT |
| NEA-IHPS-2082/083-HMST-02 | Design, Fabrication, Supply, Installation, Testing and Commissioning of the Bulkhead Gates with Hoisting System, Repair and Maintenance of Intake Gates (HRT Intake Gate & Diversion Weir Gate) | M/s Machhapuchre Metal & Machinery Works Pvt.Ltd, Pokhara | NRs. 38,43,695.00 With VAT |
| NEA-IHPS-2082/083-EMST-03 | Supply and Delivery of Electrical, Mechanical and General Consumables at Ilam (Puwakhola) HPS | M/s Himalaya Electricals Pvt.Ltd., Biratnagar, Nepal | NRs. 17,72,896.55 With VAT |
| PROK-TWB-2082/83-03 | Road and Drain Construction Work at TWB. | M/s R.P. Construction & Engineering Pvt.Ltd. Thapagaun-10, Kathamandu. | NRs. 25,88,924.02 With VAT |
© 2026 Suchanaa. All Rights Reserved.