Nepal Water Supply Institute
Branch Office
Kalaiya, Bara
| NWSC-KLY-03-2082/083 | Construction of 300/200mm dia Deep Tubewell to depth of 250 m At Kalaiya-23 Bhatudha Pump Station | Satyam Boring Udhyog, Birgunj Parsa, Nepal | Rs. 58,01,302.00 including VAT |
© 2026 Suchanaa. All Rights Reserved.