Lumbini Provincial Government
Ministry of Physical Infrastructure
Development Transport Infrastructure Directorate
Road Infrastructure Development Office Banke, Nepal
| RIDO/BANKE/ROAD/W/NCB/42/082-83 | Asphalt Concrete work at Khajura B Gau E Gau Pedari Chanauwa Hudai Maitahawa Chowk Road | Om Builders Baijanath 5 Banke | Rs. 7,792,000.07 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/43/082-83 | Asphalt Concrete & Road side drain at Gaughat Puraina Mangalpur Godana Sonbarsa hudai Baijanath 8 Pipiri Jodne Road | P.K.Construction Gulariya 6 Bardiya | Rs. 6,616,449.31 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/44/082-83 | Black top Maintenance work at Chyama RRM Samjhana 3 Chowk MRM Khajura Rimjim chowk Radhapur Road (CH. 11+500 to 5+000) | Mastadev Nirman Sewa, Kohalpur-8, Banke | Rs. 6,853,909.58 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/45/082-83 | Slab Culvert & Asphalt Concrete work at Piprahawa Khajura 4 Gapa ko Jalpokari hudai Shuvapuri sai Gau Sima dekhi Rampur Beldanda | Siddha Malika Nirman sewa Janaki 1 Banke | Rs. 8,996,448.14 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/46/082-83 | Construction of Two Roads A) Road side drain work at Kalika Nagar chowk dekhi Ekata Nagar Duduwa Khola samma B) Road side drain work at Purba bagsori Tol Uttar Tribeni chowk hudai Ekata Nagar | Bibash and Utsav Nirman Sewa, Thulibheri 3 Dopha | Rs. 2,440,943.20 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/47/082-83 | Black top Work at Bikas nagar Tol Kohalpur 5 Banke | Mastadev Nirman Sewa, Kohalpur-8, Banke | Rs. 1,521,662.33 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/48/082-83 | Road Side drain & Gravel work at Manakamana chowk dekhi 7 Bishanu Sharan Aacharaya ko ghar hudai Mugali Tol Jodne Road | ALVEEN BUILDERS, RAPTI SONARI-06, BANKE | Rs. 1,546,344.47 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/49/082-83 | Asphalt Concrete work at Kulman Chowk dekhi H-Gaun jodne Road, Baijnath-6, Banke | Om Builders Baijanath 5 Banke | Rs. 2416426.29 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/50/082-83 | Construction of Three Roads A) Dilip Regmi Ko Ghar Dekhi Dhachin Prem Bista Ghar Hudai Pachim tarpha Parimal Bista Ghar B) Hari Gosae ko Ghar Dekhi Pachim Daljit Rasaeli ko Uttar Dilip Regmi ko Ghar samma C) Rajkumari Thapa ko Ghar Dekhi Sagun Shrestha and Rambahadur B.K ko Ghar ko Pachim Tarpha Hulaki Sadak Jodne Bato | Sadbhab Nirman Sewa, Raptisonari 4 Banke | Rs. 2,847,963.47 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/51/082-83 | RCC drain at Rapti Hulaki Sadak Dekhi Dachin Purba Tarpha pandav Chanda ko Ghar Samma | Kasi Construction, Nepalgunj 6 Banke | Rs. 1,602,074.37 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/52/082-83 | RCC drain work at Milanchowk Dekhi Rajha Biman Esthal Samma | Prashidha Nirman Sewa, Khajura 1 Banke | Rs. 1,697,294.87 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/53/082-83 | Box Culvert at Karmona Nala culvert Nirman Kasturi Marga | K.R.Construction, Baijanath 6 Banke | Rs. 3,536,345.10 with VAT & PS |
| RIDO/BANKE/ROAD/W/NCB/54/082-83 | PCC pavement at BP chowk Dekhi Karmona | Nandi Construction, Nepalgunj 18 Banke | Rs. 2,002,229.64 with VAT & PS |
© 2026 Suchanaa. All Rights Reserved.