Special Economic Zone Authority
Tripureshwor, Kathmandu
| MoICS/SEZA/WORKS/04-082/83 | Construction of Remaining Infrastructures as per Master Plan along Block A of Simara SEZ, Bara | Chhathiya-Suman-SonuMonu JV, Bara | Rs. 3,15,64,131.42 VAT and P.S. included |
© 2026 Suchanaa. All Rights Reserved.