Lumbini State Govt
Ministry of Urban Development and Water Supply
Water and Sanitation Office
Bijuwar, Pyuthan
| WSSOPyuthan/NCB/Works/05/2082/083 | Electrification Works(Supply and Installation of HT/LT Line) in Baharekhola Lift WSP,Pyuthan M-09, Pyuthan | Shree Rainbow Builders, Naubahini-5, Pyuthan | Rs. 25,99,384.20 inclusive of VAT |
| WSSOPyuthan/NCB/Works/06/2082/083 | Electrification Works(Supply and Installation of HT/LT Line) in Godhara Saurakot Pyalimati Lift WSP,Sarumarani R.M-05, Pyuthan | Shree Harj Engineering, Pvt. Ltd. Kathmandu-30 | Rs. 25,98,690.38 inclusive of VAT |
| WSSOPyuthan/NCB/Works/07/2082/083 | Electrification Works(Supply and Installation of HT/LT Line) in Bartan Lift WSP,Sworgdwari M-03, Pyuthan | Shree M. H. Pushpakendra Engineering, and Construction Pvt. Ltd. Swargadwari N.P.-4, Pyuthan | Rs. 14,08,038.76 inclusive of VAT |
| WSSOPyuthan/NCB/Works/08/2082/083 | Electrification Works(Supply and Installation of HT/LT Line) in Hanspur 6-8 Lift WSP,Sarumarani R.M-03, Pyuthan | Shree Rainbow Builders, Naubahini-5, Pyuthan | Rs. 33,82, 457.25 inclusive of VAT |
| WSSOPyuthan/NCB/Works/09/2082/083 | Construction of Sumpwell in Darbhan Bajar Lift WSP, Sarumarani R.M.-02, Pyuthan | Plaster Construction Service, Airavati-5, Pyuthan | Rs. 17,24,037.84 inclusive of VAT |
© 2026 Suchanaa. All Rights Reserved.