| BIP/Baghi/SQ-5/082-083 | Construction of RCC Canal lining work in WMC-Baghi-BC-Hariharpur-SL2 |
| BIP/EMC/SQ-1/082-083 | Command Area protection Area in Hariwon khola,Tinghare Naya Baste,Bagmati-3 |
| BIP/EMC/SQ-2/082-083 | Command Area Protection Works in Hariwon khola ,Tinghare Naya Baste ,bagmati-3,Sarlahi |
| BIP/Gadhaiya/SQ-7/082-083 | RCC Canal Lining Construction Works & Canal maintenance works in SR1 Secondary outlet from CH-0+480,Right of Dhangdha Distributary |
| BIP/Gadhaiya/SQ-8/082-083 | Rcc Canal lining Construction works in SL1 Secondary outlet ,left side of Gadhaiya Branch Canal |
| BIP/Gadhaiya/SQ-9/082-083 | RCC Canal lining construction works in GA/SL2 From CH-6+720 Of left side of Gadhaiya Branch Canal |
| BIP/GadhaiyaSQ-10/082-083 | RCC Canal lining construction works in GA/SR0 Secondary outlet From CH-5+550 ,right side of Gadhaiya Branch Canal |
| BIP/Manpur/SQ-10/082-083 | Canal maintenance and Lining Works at various chainage of Barhathwa SBC |
| BIP/Manpur/SQ-9/082-083 | Construction of Road Crossing(Escape) and VRB, EMC, Manpur BC, Barhathwa SBC |
© 2026 Suchanaa. All Rights Reserved.