Government of Nepal
Ministry of Energy, Water Resources and Irrigation Department of Water Resources and Irrigation
Groundwater Irrigation Project
Rupandehi
| GWIPR/Works/NCB-01/082-83 | Construction of Buried Pipeline Distribution System at shudodhan-03, Kapilvastu. |
| GWIPR/Works/NCB-02/082-83 | Construction of Buried Pipeline Distribution System at Devdah-08, Bishalnagar, Rupandehi. |
| GWIPR/Works/NCB-03/082-83 | Construction of Pump House with Overhead Tank and Construction of Buried Pipeline Distribution System at Kotahimai-07, Parsahawa, Rupandehi. |
| GWIPR/Works/NCB-04/082-83 | Construction of Pump House and Buried Pipeline Distribution System at Bijaynagar-06, Juthpaniya, Kapilvastu. |
| GWIPR/Works/NCB-05/082-83 | Construction of Pump House and Buried Pipeline Distribution System at Bijaynagar-06, Baddaur, Kapilvastu. |
| GWIPR/Works/NCB-06/082-83 | Construction of Pump House with Overhead Tank and Buried Pipeline Distribution System at Omsatiya-04, Madhuri, Rupandehi. |
| GWIPR/Works/NCB-07/082-83 | Construction of Pump House with Overhead Tank and Buried Pipeline Distribution System at Bardghat-02, Chisapani, West Nawalparasi. |
| GWIPR/Works/NCB-08/082-83 | Construction of Pump House with Overhead Tank and Buried Pipeline Distribution System at pratapur-05, Khairetawa, West Nawalparasi. |
| GWIPR/E&M-works/NCB-09/082-83 | Electrification work and Instillation of Pump at different Location of Kapilvastu District. (Jutpaniya, Baddour, Asuraina). |
| GWIPR/E&M-works/NCB-10/082-83 | Electrification work and Instillation of Pump at different Location of Rupandehi District. (Kotahimai-07, Parsahawa, Omsatiya-04, Madhuri, Butwal-18, Pokharabari, Devdah-08, Bishalnagar). |
| GWIPR/E&M-works/NCB-11/082-83 | Electrification work and Instillation of Pump at different Location of West Nawalparasi. (Pratapur-05, Khairetawa, Bardghat-02, Bisaiya, Srawal-01, Khokharpura, Srawal-02, Manari). |
© 2026 Suchanaa. All Rights Reserved.