Don't have an account?
Already have an account?
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
Narayani Irrigation Management Office
Birgunj, Parsa
| NIMO/NCB-13/Bipad-01/2082-83 | Canal bank strengthening cum RCC lining work In different locations of NEC (ch. inbetween 16+450 to 22+500) |
| NIMO/NCB-14/Bipad-02/2082-83 | Canal bank strengthening cum RCC lining work at different locations in NEC (between Feta to Matiarwa, Bara) |
| NIMO/NCB-15/Sukha-01/2082-83 | Construction of 8"/6" dia. 1 Nos. of Deep Tubewell including Installation of Submersible Pump, Electrification Work and MS Box in Block 4 of Parsa District |
| NIMO/NCB-16/Sukha-02/2082-83 | Construction of 8"/6" dia. 2 Nos. of Deep Tubewells including Installation of Submersible Pump, Electrification Works and MS Box in Block 9 and 10 of Bara District. |
© 2026 Suchanaa. All Rights Reserved.