Nepal Electricity Authority
| MKHPS-2082/83-CSQ-02 | Repair and maintenance of water supply intake of MKHPS at Chitre |
| CW-ST-2082/83-20 | Supply and Delivery of 18 S.W.G & 18.5 S.W.G. Super Enameled Copper Wires |
| CW-ST-2082/83-21 | Supply and Delivery of 21 S.W.G & 23 S.W.G. Super Enameled Copper Wires |
| CW-ST-2082/83-22 | Supply and Delivery of 16 S.W.G to 20 S.W.G. Super Enameled Copper Wires |
| CW-ST-2082/83-23 | Supply and Delivery of TPC Paper Insulated Copper Strips |
| CW-SQ-2082/83-26 | Third Party Re-Calibration of Testing Equipment |
| NEA-ILAMDC-2082/083-03SQ | Construction of LT Line and Wooden Pole Replacement on LT line (Estimated Amount with VAT NRS.5,06,048.41) |
| NEA-DHARANDCS-2082-083-01SQ | Supply and Delivery of Stationery & Other Goods |
| NEA-ADC-2082/083-SQ-01 | Electrification works at Bannigadhi Ga.Pa 06 Darna of Achham District |
| NEA/BDC-2082/083-SQ-01(Re) | Supply and Delivery of Printing and Stationery Materials |
| NCB-DCSD-2082/83-DSUEP-EIB-G3 | Supply and Delivery of Four-Wheel Drive Double Cab Pick-up Truck |
© 2026 Suchanaa. All Rights Reserved.