Nepal Electricity Authority
| NEA/DCSD/PTSD/DSVIPN/082/83-101 | Supply, Delivery, Installation/Erection, Testing and Commissioning of Capacitor Banks at Different Substation of Distribution Network |
| NEA-LPO-2082/83-08(SQ) RE | Construction of Gate and Road in Saljhandi Sub-Station |
| NEA-LPDON-2082/083-SQ-13(RE) | Repair and Maintenance of Vehicles |
| NEA-DHPS-2082/83-CSQ-03-RE | Civil maintenance works at powerhouse and quarter area |
| NEA-SPHPS-2082/083-HMST-05(Re) | Repair and Maintenance of Hydro-Mechanical Systems of Units #1, #2, and #3 at Fewa Hydropower Station, Baidam, Pokhara |
| KGA-2082/83-CSQ-01-RE | Water Supply Project for Powerhouse Camp Area |
| NEA/JDC/2082/083-SQ-03(Re) | Supply and Delivery of Stationery, Printing and Miscellaneous Items. |
| NEA-BELBARIDC-2082/083-SQ-04-RE | HT/LT Re-inforcement< Line Extension works(in diffrent places of Belbari DC |
| NEA-LDC-2082/083-SQ-T02 | Re-location of HT, LT line and Transformer Posts at Kharapani to Baisjagar of Bhanu MP, Tanahun |
| NEA-LDC-2082/-SQ-T03 | Supply and Delivery of Electrical Equipments and Tools |
| NEA/SDC/2082/083-06SQ | Shifting, Loading, Unloading, Installation, Testing and Commissioning of 33/11kV, 6/8 MVA Power Transformer from Ratnanagar Tandi, DCS Substation, Tandi Chitawan to Sindhuli DCS Khurkot (Bara) Substation and Shifting of 33/11kv, 4 MVA Power Transformer from Khurkot (Bara) Substation, Sindhuli DCS, Sindhuli. |