Don't have an account?
Already have an account?
| SIP/CAD/EMC/PBC/NCB-19/082-83 | Rehabilitation and Maintenance of the Phattepur Branch Canal up to Ch. 4+200, including the Rehabilitation of S1, S2, and S3 Sub-Branch Canals |
| SIP/CAP/EMC/NCB-17/082-83 | Protection of Sikta Village from Backwater Flow of the West Rapti River Caused by Ponding at Sikta Barrage during Canal operation |
| SIP/CAP/NCB-27/082-83 | Command Area Protection Work at Bandaraiya Naala |
| SIP/M-EMC/NCB-18/082-83 | Maintenance of Eastern Main canal along with construction of HRCR at S2, Canal Lining at S3,Causeway, catch drain at Bhuwarbhawani Temple, VRB's at main Canal, etc. |
© 2026 Suchanaa. All Rights Reserved.