Joint Venture of Lahmeyer International GmbH and Jade Consult Pvt. Ltd. is currently seeking professional expert for Consulting service as Owner's Engineer of Upper Trishuli-1 Hydro Power Plant. Upper Trishuli-1 Hydroelectric Project is a ROR scheme on Trishuli River with 216 MW installed capacity located in Mailung, Rasuwa.
Position : Chief Resident Engineer (Site Based)
Nationality : Nepali/Foreign
Qualifications/Experience
Interested candidates are requested to submit their application along with their CV via email to ramchandra.dahal@lahmeyer.com by 22nd August 2025.
Source: Himalaya Times
Ward No.4, Shanti Chowk Marg, Jawalakhel
© 2025 Suchanaa. All Rights Reserved.