Joint Venture of Lahmeyer International GmbH and Jade Consult Pvt. Ltd. is currently seeking professional expert for Consulting service as Owner's Engineer of Upper Trishuli-1 Hydro Power Plant. Upper Trishuli-1 Hydroelectric Project is a ROR scheme on Trishuli River with 216 MW installed capacity located in Mailung, Rasuwa.
Position: Chief Resident Engineer (Site Based)
Nationality: Nepali/Foreign
Qualifications/Experience
Interested candidates are requested to submit their application along with their CV via email to ramchandra.dahal@lahmeyer.com no later than 29th July 2026, 5:00 PM
Source: Himalaya Times
Shanti Chowk Marg, Jawalakhel, Ward 04, Lalitpur MC, Lalitpur, Bagmati
© 2026 Suchanaa. All Rights Reserved.